Presentation of the project :
The Rockhampton Ring Road project is situated near the town of Rockhampton. Within the scope of the project is the Fitzroy River Bridge which will be a match-cast segmental balanced cantilever structure. VSL’s expected involvement in the project is the casting and erection of the ~350 match-cast segments of the Fitzroy River Bridge.
Missions :
Short-term: start playing a role in the project technical team to participate in the planning and development of construction methodology in advance of the works (technical/methodological phase)
Long-term: with the start of site work, we would look to transition the candidate into a site engineering role for production works in either the match-casting or the erection works teams.